Title: Potential of Power Production from Gebit Alsharaf Dam, Red Sea State, Sudan
Author: Abdelgadir, Moataz Abdelgadir Ali
Abstract: The purpose of this thesis is to study the possibility of the potential of hydro power for the establishing hydraulic turbine in the line of water pipes in Gebit Alsharaf Dam in order to convert the available energy of water in to electrical energy.It is known thatthe Dam Implementation Unit (DIU) of the Federal Ministry of Water Resources and Energy has constructed Gebit Alsharaf Dam to solve the problem of water supply by storing and harvesting the rainfall runoff. In this thesis the data collected from the dam site in terms of its hydrological and topographic studies at Gebit Alsharafwas analyzed and the power was estimated using the governing fluid dynamics equations. Then the suitable turbine and generator was selected and the resultant power was 19.39 kW. Finally the results were compared by using (Hydro Help - CLOVA issue, January 2010)program and it’s found to be very acceptable
Description: 110page
URI: http://khartoumspace.uofk.edu/handle/123456789/20300
Date: 2016-04-11